Close Me!

Maxim Cubicles

Good looking and very robust, these cubicles never give in

  • Maxim Cubicles

    Good looking and very robust, these cubicles never give in

  • Freestanding island Cubicles

    Unique flip down benches

  • Océan lockers

    Robust lockers with aluminium-carcasses and sprung-hinged doors

  • Xeista vanity

    Aesthetic appeal and functional durability combine in this vanity

  • Wet and dry aisles

  • Opex benching

    Powder-coated framework combined with solid-ash timber slats

Purpose-built changing facility gives finishing touch to new sports complex

Flexibility and user-friendliness were key to the design of this changing area at Sunderland sports centre. Originally intended to have a straightforward cubicle system, it was changed to a walk- through system as a result of consultation between Maxwood and the project architect and contractor.

The resultant two-way cubicles separate wet walkways from dry. Visitors exiting the swimming pool enter a cubicle from a 'wet aisle', lock the doors at both ends, and flip down the side bench for comfort whilst drying. When finished, exiting the cubicle at the other end leads to one of the 'dry aisles' for safe departure in footwear.


Bournville Primary School

Buckingham Avenue

Devonshire House

Grosvenor Gym

Heston School

John Fernley School

Oxford Academy

Sevenfields School

Sports Centre

St Bride Street

St Thomas' Hospital

Wellbar Central